QBuild contracted Ozcrete to build 6 swimming pools for the redevelopment of the Lavarack Barracks. Ozcrete was the primary builder undertaking all aspects of the construction. This covered all excavation, set out, steel fixing, concrete spraying & placement, tiling, paving, application of the interior finish, supply and installation of the plumbing, filtration and safety fencing. This project was started on the 23/11/2000 and finished on the 13/5/2001
New Pool
QBuild
05/2001